Pool Remodel in Las Vegas

If you have a swimming pool in your backyard in Las Vegas, you may be considering an upgrade. You may wish to modify your pool for a variety of reasons. Perhaps you need to resurface your pool’s finish and want to update it with the latest technology. Perhaps you bought a house with an existing pool and want to update the look to suit your tastes. These are just a few reasons to consider a pool remodel in Las Vegas.

Whatever your reason for wishing to renovate your pool, this pool remodeling timetable will show you how long it will take to realize your goal.

Timeline for Pool Renovations

When it comes to updating an old inground pool, there are numerous alternatives available, each with its own schedule. For example, one of the more straightforward pool remodeling projects is resurfacing (the process of resurfacing the pool’s interior, replacing the waterline tile if necessary, and repairing or updating the pool deck). A major inground pool remodel, which includes redesigning the pool and adding to the deck, takes longer.

How long does it take to renovate a swimming pool? Here’s a standard pool remodeling timeline to help you get started with your planning. Keep in mind that delays in the procedure may occur due to unanticipated situations, making this schedule shorter or longer. This timeline, on the other hand, will provide you with an excellent starting point.

Planning

Spend some time gathering inspiration and deciding how you want your future pool to look before you reconstruct it. Allow yourself at least a few weeks to prepare, brainstorm, and schedule meetings with your contractor.

Remember that while you may have a concept of how you want your finished swimming pool remodel to look, the professional has the knowledge and expertise to make professional recommendations, design suggestions, and product options. It should take one to two weeks to come up with ideas and designs.

Tear Down

Whether you’re replacing pool tile and the contractor needs to chip away at the old tile, or you’re conducting a pool deck remodel and the contractor wants to dismantle a portion of your old deck, they’ll need time to tear it down. This process can take one to two weeks depending on the size of the pool or deck remodel.

Implementing Your Design

Now that the planning and demolition are done, the contractor may start working on the improvements. The amount of work you need done will determine how long this process takes. Expect the contractor to complete a resurfacing project in one to two weeks. You should budget two to three weeks for more intricate improvements like redesigning a pool or building a beach entry.

Contact Us

Pool renovations generally take 4-8 weeks from start to finish, depending on the size of your pool, the complexity of the design, material availability, and your contractor’s timetable. Feel free to contact us if you want to get a quote for your next pool remodel in Las Vegas!